Reading the Draw Sheet
Four percentages on every budget line keep each draw within budget: Max, Previous, Available, and Current.
Runs on: Desktop and tablet. A web app you open in a browser; it is not built for phones.
Quick Reference
Max% is the line's share of the budget.
Previous% is what earlier inspections approved.
Available% is Max minus Previous.
Current% is this visit's entry and can't exceed Available.
Before You Start
You have opened a submitted job's Draw Sheet.
Step 1 — Know the Four Columns
Max%
The line's full share, from the Budget tab.
Previous%
What earlier inspections approved on the line.
Available%
What is left to draw: Max minus Previous.
Current%
What the inspector entered this visit. It can never exceed Available.
Step 2 — Read Two Real Lines
Cabinet and Clearing / Grading / Building Permit
Cabinet: Max 4.00%, Previous 0.00%, so 4.00% is Available. Clearing / Grading / Building Permit: Max 4.00%, Previous 4.00%, so nothing is Available.
Step 3 — Follow the Cycle
Approval rolls it forward
When you approve, Current% moves into Previous%. The next inspection starts from the new Previous%, and the cycle repeats until every line reaches its Max%.
Tips
DO
- •Check that lines with 0.00% Available are not drawn again.
- •Plan the budget categories early, because Max% comes from the budget.
WATCH FOR
- •Changing a budget line's share affects jobs already ordered.
Troubleshooting
Lender workflow
- Read Draw Sheet percentages (this guide)
Use this guide with AI.
Ask RAZE AI here, or hand the plain-text guide to the assistant you already use.
Was this guide helpful?
Still stuck? Ask RAZE.
Ask RAZE AI for an instant answer from these guides, or send a request and the RAZE support team replies by email.
Ask RAZE AI.
Instant answers from these guides, any time.
Send a support request.
Tell us the product and guide; the form is here.
Call or email.