Construction Draw Inspection Report
0006 Example Ridge Way, Georgia · Draw 1
Example report
$738,000.00
Budget Amount ($)
0.00%
Previous Complete (%)
65.14%
Total (%)
$480,700.00
Total ($)
65.14%
Current Complete (%)
$480,700.00
Current Complete ($)
Draw sheet lines 15 to 17 of 35
Description
Budget
Total
Total ($)
Exterior windows & doors
$21,500
100%
$21,500
Completed.
Siding
$36,000
95%
$34,200
Some siding remains
Exterior trim & gutters
$9,500
100%
$9,500
Completed.
25
9/25/26 07:57 EDTSubject front
18
9/25/26 07:56 EDTSheetrock hung - being finished
12
9/25/26 07:55 EDTBathroom Tile
Example reports from RAZE demo projects, with amounts adjusted. Choose Banks, Credit Unions, or Private Lenders above to see each format.
Required photos and completion checks before funds go out
Draw inspection coverage at any U.S. address
One report format across every project
51,000+ inspections submitted through the RAZE app
Three RAZE residential draw reports from demo projects: a bank report with the lender's logo on the cover, a credit union draw on an eight-stage schedule, and a private lender draw on a line-item budget. Every report follows your template and fields and is delivered as a PDF in the Ordering Engine and by API.
Construction Draw Inspection Report
0006 Example Ridge Way, Georgia · Draw 1
Example report
Inspector
Sample Inspector
Project
Sample Borrower
General Contractor
Sample Builder
Draw
1
Draw Sheet
$738,000.00
Budget Amount ($)
0.00%
Previous Complete (%)
65.14%
Total (%)
$480,700.00
Total ($)
65.14%
Current Complete (%)
$480,700.00
Current Complete ($)
Photographs
25
18
12
4
Alerted
No answers
Required
No answers
Swipe the draw sheet to see every column.
Draw sheet: 35 lines with budget amount, previous complete, total and current complete
Description
Budget Amount ($)
Previous Complete (%)
Total (%)
Total ($)
Current Complete (%)
Current Complete ($)
Clear lot & rough grade
$5,500.00
0%
100%
$5,500.00
100%
$5,500.00
Completed.
Footings
$10,500.00
0%
100%
$10,500.00
100%
$10,500.00
Completed.
Foundation walls & piers
$9,500.00
0%
100%
$9,500.00
100%
$9,500.00
Completed.
Floor framing (joists)
$26,000.00
0%
100%
$26,000.00
100%
$26,000.00
Completed.
Subfloor
$9,000.00
0%
100%
$9,000.00
100%
$9,000.00
Completed.
Exterior walls & sheathing
$102,000.00
0%
100%
$102,000.00
100%
$102,000.00
Completed.
Interior walls & ceiling joists
$52,000.00
0%
100%
$52,000.00
100%
$52,000.00
Completed.
Roof framing
$23,500.00
0%
100%
$23,500.00
100%
$23,500.00
Completed.
Roof sheathing & underlayment
$10,500.00
0%
100%
$10,500.00
100%
$10,500.00
Completed.
Permanent roof
$16,000.00
0%
100%
$16,000.00
100%
$16,000.00
Completed.
Chimney / outdoor fireplace
$6,000.00
0%
0%
$0.00
0%
$0.00
Rough-in plumbing
$12,500.00
0%
100%
$12,500.00
100%
$12,500.00
Completed.
Rough-in electrical
$11,500.00
0%
100%
$11,500.00
100%
$11,500.00
Completed.
Rough-in HVAC (ductwork)
$14,500.00
0%
100%
$14,500.00
100%
$14,500.00
Completed.
Exterior windows & doors
$21,500.00
0%
100%
$21,500.00
100%
$21,500.00
Completed.
Siding
$36,000.00
0%
95%
$34,200.00
95%
$34,200.00
Some siding remains
Exterior trim & gutters
$9,500.00
0%
100%
$9,500.00
100%
$9,500.00
Completed.
Exterior paint (prime)
$5,500.00
0%
100%
$5,500.00
100%
$5,500.00
Completed.
Insulation (walls & ceilings)
$8,500.00
0%
100%
$8,500.00
100%
$8,500.00
Completed.
Drywall (walls & ceilings)
$10,500.00
0%
100%
$10,500.00
100%
$10,500.00
Completed.
Interior trim
$14,500.00
0%
0%
$0.00
0%
$0.00
Kitchen cabinets
$34,000.00
0%
0%
$0.00
0%
$0.00
Interior doors
$14,000.00
0%
0%
$0.00
0%
$0.00
Interior paint (prime)
$5,500.00
0%
100%
$5,500.00
100%
$5,500.00
Completed.
Bathroom tile (floors & walls)
$21,000.00
0%
80%
$16,800.00
80%
$16,800.00
Some tile remains
Plumbing finish (baths & kitchen)
$26,000.00
0%
0%
$0.00
0%
$0.00
Interior paint finish
$2,500.00
0%
0%
$0.00
0%
$0.00
Hardware (doors, windows, cabinets)
$7,500.00
0%
0%
$0.00
0%
$0.00
Electrical finish, fixtures & trim
$6,500.00
0%
0%
$0.00
0%
$0.00
Exterior paint finish
$2,500.00
0%
100%
$2,500.00
100%
$2,500.00
Completed.
HVAC equipment
$6,500.00
0%
0%
$0.00
0%
$0.00
Floor covering
$16,000.00
0%
0%
$0.00
0%
$0.00
Exterior concrete (driveway, walks)
$17,500.00
0%
0%
$0.00
0%
$0.00
Finish grade & landscape
$5,500.00
0%
0%
$0.00
0%
$0.00
Decks, porches & patios
$158,000.00
0%
40%
$63,200.00
40%
$63,200.00
Decking needs stain and some hardware remains
Total
$738,000.00
0.00%
65.14%
$480,700.00
65.14%
$480,700.00
Inspection Totals:
Budget Amount ($)
$738,000.00
Previous Complete ($)
$0.00
Total Complete ($)
$480,700.00
Current Complete ($)
$480,700.00
Inspection Notes
* Required · Alerted Response · Comment
Were you able to confirm this project location's accuracy with a representative on-site?
Yes
Was GC on-site?
No
What is the temperature at the time of arrival?
50 - 60 F
What are the weather conditions at the time of arrival?
Partly Cloudy
How many workers present at time of the inspection?
Showing 6 of 25 photographs, numbered to the report.
25
Tags
Finish Woodwork, Framing, Siding
Time
9/25/26 07:57 EDT
Location
GPS latitude and longitude, with a map on the report
Comment
Subject front
Rendered from RAZE demo projects. Line items and amounts are adjusted, and names, contact details and GPS coordinates are left out; delivered reports include them.
Draw sheet by budget line or draw stage
Percent complete and the dollars it supports on every line of your budget, with inspector comments where work remains.
Time and location stamped photographs
Numbered to the draw sheet and tagged by trade, with the capture time and GPS location on every photo.
Inspection notes
The same on-site questions on every visit, such as whether the GC was on site, how many workers were present, and any known critical issues.
Your template and your branding
Required photos and fields are configured per workflow, and the cover can carry your institution's logo, as on the bank report.
1.1
Days on average from request to submission (residential)
Why private lenders use RAZE before releasing funds.
When you fund draws across markets, you need the same evidence on every project, no matter who is on site.
Evidence Before Every Release
Guided capture requires the photos, observations, and completion criteria your draw policy calls for, tied to each request.
Out-of-Market Coverage
Send your own inspectors through Direct Request where you have them and let the Marketplace assign a vetted inspector where you don't, through one ordering process.
Spot Unsupported Draws Early
Standardized reports make it easier to see when work in place does not support the amount requested, before funds are released.
How Getting Started Works
From first call to first inspection.
RAZE adds a standardized inspection workflow around the systems you already use.
01
Request a Demo
In a 30-minute walkthrough we review how your team orders, tracks, and reviews draw inspections today, show the RAZE workflow on your loan types, and cover pricing and next steps.
02
Configure Your Workflow
Set required photos, observations, report format, and routing, using your inspectors and vendors through Direct Request, Marketplace coverage, or a mix.
03
Order Your First Inspections
Your team orders in the Ordering Engine, inspectors capture on site in the RAZE Mobile App, and standardized PDF reports are delivered in the Ordering Engine and by API.
FAQ
Questions lenders ask before getting started.
What happens on the demo?
It's a 30-minute call with the RAZE team. We review how you order, track, and review draw inspections today, show the RAZE workflow on your loan types, and cover pricing and next steps.
What does it cost to get started with RAZE?
$125 per single-family inspection through the Marketplace, plus $35 per additional unit. Direct Request is $25 per request. No minimums and no platform fee. Some programs include a one-time implementation fee, quoted before you sign.
How quickly does RAZE return a residential draw inspection?
RAZE averages 1.1 days from request to submission on residential draw inspections nationwide. Timing on any one inspection depends on site access, weather, and scheduling.
Do we need to change our loan systems to start?
No. RAZE layers around your CLA, LOS, and core and replaces none of them. RAZE also integrates with Presidium (by Codefi).
Can we start with our own inspectors?
Yes. With Direct Request, you send your own inspector or vendor through the same workflow and template. Where you need coverage, the Marketplace assigns a vetted inspector.
Can report requirements follow our draw policy?
Yes. Required photos, observations, and report expectations are configured per workflow, so every inspection follows your policy.
Are photos and inspection records retained for audits?
Yes. Images, notes, and inspection context stay attached to each inspection record.
Can we order inspections outside our home market?
Yes. Where you don't have inspectors, the Marketplace assigns a vetted inspector at any U.S. address, including Alaska and Hawaii, through the same ordering process and report format.