Construction Draw Inspection Report
0005 Example Creek Road, Georgia · Draw 1
Example report
$512,000.00
Budget Amount ($)
0.00%
Previous Complete (%)
20.31%
Total (%)
$104,000.00
Total ($)
20.31%
Current Complete (%)
$104,000.00
Current Complete ($)
Draw sheet lines 1 to 3 of 8
Description
Budget
Total
Total ($)
S1-Permits/Fees
$46,000
100%
$46,000
Completed.
S2-Site/Ftg/Slab
$58,000
100%
$58,000
Completed.
S3-Frmg/Roof/Rough MEP/Wndws
$132,000
0%
$0
2
9/24/26Driveway and parking area
4
9/24/26Slab
6
9/24/26Rear View
Example reports from RAZE demo projects, with amounts adjusted. Choose Banks, Credit Unions, or Private Lenders above to see each format.
Status at every step, from request to report
Standardized reports your reviewers can validate quickly
No core, LOS, or servicing replacement
51,000+ inspections submitted through the RAZE app
Three RAZE residential draw reports from demo projects: a bank report with the lender's logo on the cover, a credit union draw on an eight-stage schedule, and a private lender draw on a line-item budget. Every report follows your template and fields and is delivered as a PDF in the Ordering Engine and by API.
Construction Draw Inspection Report
0005 Example Creek Road, Georgia · Draw 1
Example report
Inspector
Sample Inspector
Project
Sample Borrower
General Contractor
Sample Builder
Draw
1
Draw Sheet
$512,000.00
Budget Amount ($)
0.00%
Previous Complete (%)
20.31%
Total (%)
$104,000.00
Total ($)
20.31%
Current Complete (%)
$104,000.00
Current Complete ($)
Photographs
2
4
5
6
Alerted
No answers
Required
No answers
Swipe the draw sheet to see every column.
Draw sheet: 8 lines with budget amount, previous complete, total and current complete
Description
Budget Amount ($)
Previous Complete (%)
Total (%)
Total ($)
Current Complete (%)
Current Complete ($)
S1-Permits/Fees
$46,000.00
0%
100%
$46,000.00
100%
$46,000.00
Completed.
S2-Site/Ftg/Slab
$58,000.00
0%
100%
$58,000.00
100%
$58,000.00
Completed.
S3-Frmg/Roof/Rough MEP/Wndws
$132,000.00
0%
0%
$0.00
0%
$0.00
S4-Insul/Drywall/ExtFinish/Trim
$98,000.00
0%
0%
$0.00
0%
$0.00
S5-Paint/Doors/Cabinets
$51,000.00
0%
0%
$0.00
0%
$0.00
S6-Tile/Garage/Mech/Hardware
$48,000.00
0%
0%
$0.00
0%
$0.00
S7-Drives/Appliances
$41,000.00
0%
0%
$0.00
0%
$0.00
S8-Floors/Landscape/Misc
$38,000.00
0%
0%
$0.00
0%
$0.00
Total
$512,000.00
0.00%
20.31%
$104,000.00
20.31%
$104,000.00
Inspection Totals:
Budget Amount ($)
$512,000.00
Previous Complete ($)
$0.00
Total Complete ($)
$104,000.00
Current Complete ($)
$104,000.00
Inspection Notes
* Required · Alerted Response · Comment
Were you able to confirm this project location's accuracy with a representative on-site?
No
Was GC on-site?
No
Was the permit box posted on-site?
Yes
What is the temperature at the time of arrival?
70 - 80 F
What are the weather conditions at the time of arrival?
Partly Cloudy
How many workers present at time of the inspection?
0
Any known critical issues?
No
2
9/24/26Driveway and parking areaTags: Grading, Driveway
4
9/24/26SlabTags: Slab
5
9/24/26Side ViewTags: Molded Walls
6
9/24/26Rear ViewTags: Slab
Showing 4 of 6 photographs, numbered to the report.
2
Tags
Grading, Driveway
Time
9/24/26
Location
GPS latitude and longitude, with a map on the report
Comment
Driveway and parking area
Rendered from RAZE demo projects. Line items and amounts are adjusted, and names, contact details and GPS coordinates are left out; delivered reports include them.
Draw sheet by budget line or draw stage
Percent complete and the dollars it supports on every line of your budget, with inspector comments where work remains.
Time and location stamped photographs
Numbered to the draw sheet and tagged by trade, with the capture time and GPS location on every photo.
Inspection notes
The same on-site questions on every visit, such as whether the GC was on site, how many workers were present, and any known critical issues.
Your template and your branding
Required photos and fields are configured per workflow, and the cover can carry your institution's logo, as on the bank report.
1.1
Days on average from request to submission (residential)
Construction lending teams at credit unions are often small. RAZE removes the manual coordination so your team can focus on members.
Less Chasing, More Lending
Centralized ordering and real-time notifications replace phone and email follow-up with inspectors and vendors.
Fewer "Where's My Draw?" Calls
Your team can see where each inspection stands from request to report, so member and builder questions get a quick answer.
Consistent Files for Every Review
Every inspection follows the same required photos, observations, and report format, so loan review and examiners see a complete record.
How Getting Started Works
From first call to first inspection.
RAZE adds a standardized inspection workflow around the systems you already use.
01
Request a Demo
In a 30-minute walkthrough we review how your team orders, tracks, and reviews draw inspections today, show the RAZE workflow on your loan types, and cover pricing and next steps.
02
Configure Your Workflow
Set required photos, observations, report format, and routing, using your inspectors and vendors through Direct Request, Marketplace coverage, or a mix.
03
Order Your First Inspections
Your team orders in the Ordering Engine, inspectors capture on site in the RAZE Mobile App, and standardized PDF reports are delivered in the Ordering Engine and by API.
FAQ
Questions lenders ask before getting started.
What happens on the demo?
It's a 30-minute call with the RAZE team. We review how you order, track, and review draw inspections today, show the RAZE workflow on your loan types, and cover pricing and next steps.
What does it cost to get started with RAZE?
$125 per single-family inspection through the Marketplace, plus $35 per additional unit. Direct Request is $25 per request. No minimums and no platform fee. Some programs include a one-time implementation fee, quoted before you sign.
How quickly does RAZE return a residential draw inspection?
RAZE averages 1.1 days from request to submission on residential draw inspections nationwide. Timing on any one inspection depends on site access, weather, and scheduling.
Do we need to change our loan systems to start?
No. RAZE layers around your CLA, LOS, and core and replaces none of them. RAZE also integrates with Presidium (by Codefi).
Can we start with our own inspectors?
Yes. With Direct Request, you send your own inspector or vendor through the same workflow and template. Where you need coverage, the Marketplace assigns a vetted inspector.
Can report requirements follow our draw policy?
Yes. Required photos, observations, and report expectations are configured per workflow, so every inspection follows your policy.
Are photos and inspection records retained for audits?
Yes. Images, notes, and inspection context stay attached to each inspection record.
Is RAZE a fit for a small construction lending team?
RAZE centralizes ordering, status updates, and report delivery, so a small team can manage draw inspections without coordinating vendors by phone and email.