Standardize draw inspections across every branch and vendor.
Give every loan officer and draw administrator the same way to order, track, and review inspections, with institution-defined routing and approvals inside your existing Construction Loan Administration.
Request a Demo
A 30-minute walkthrough of the RAZE workflow on your loan types, with pricing and next steps for your team.
Sample Bank
Residential Draw Report
0001 Example Road, Florida
Example reportDraw #2 · Report Submitted
Draw sheet lines 8 to 13 of 35, with totals for all lines
#
Item
Amount
Prior
This
Available
8
Framing
$86,500
0%
100%
$86,500
9
Roofing
$24,000
0%
100%
$24,000
10
Windows & exterior doors
$48,500
0%
100%
$48,500
11
Insulation
$21,000
0%
0%
$0
12
HVAC rough-in
$41,000
0%
100%
$41,000
13
Electrical rough-in
$38,500
0%
100%
$38,500
Total, 35 lines
$904,900
20.10%
52.20%
$472,400
15
9/4/26 17:26 EDTRear exterior
2
9/4/26 17:26 EDTFraming interior with HVAC
4
9/4/26 17:26 EDTRough Plumbing
Example reports from RAZE demo projects, with amounts adjusted. Choose Banks, Credit Unions, or Private Lenders above to see each format.
One ordering process across branches and loan types
Your approved vendors and Marketplace coverage on one standard
Photos, observations, and metadata retained for audits and exams
51,000+ inspections submitted through the RAZE app
Three RAZE residential draw reports from demo projects: a bank report with the lender's logo on the cover, a credit union draw on an eight-stage schedule, and a private lender draw on a line-item budget. Every report follows your template and fields and is delivered as a PDF in the Ordering Engine and by API.
Sample Bank
Residential Draw Report
0001 Example Road, Florida
Example reportDraw #2 · Report Submitted
Lender
Sample Bank
Borrower
Sample Borrower
Builder
Sample Builder
Draw #
2
Swipe the draw sheet to see every column.
Draw sheet: 35 budget line items with line percent, amount, requested, prior inspection, eligible to fund, this inspection and current amount available
#
Item Description
Line Percent
Amount
Requested
Prior Inspection
Eligible to Fund
This Inspection
Current Amount Available
1
Permits & fees
1.53%
$13,800.00
$0.00
100%
$13,800.00
100%
$13,800.00
2
Land clearing
0.95%
$8,600.00
$0.00
100%
$8,600.00
100%
$8,600.00
3
Surveys & plans
1.57%
$14,200.00
$0.00
100%
$14,200.00
100%
$14,200.00
4
Fill & building pad
0.66%
$6,000.00
$0.00
100%
$6,000.00
100%
$6,000.00
5
Footings & stem wall
3.70%
$33,500.00
$0.00
100%
$33,500.00
100%
$33,500.00
6
Slab
3.07%
$27,800.00
$0.00
100%
$27,800.00
100%
$27,800.00
7
Block walls
8.62%
$78,000.00
$0.00
100%
$78,000.00
100%
$78,000.00
8
Framing
9.56%
$86,500.00
$0.00
0%
$0.00
100%
$86,500.00
Completed. Photos 1-15
9
Roofing
2.65%
$24,000.00
$0.00
0%
$0.00
100%
$24,000.00
Completed. Photos 15-19
10
Windows & exterior doors
5.36%
$48,500.00
$0.00
0%
$0.00
100%
$48,500.00
Completed. Photos 15-19
11
Insulation
2.32%
$21,000.00
$0.00
0%
$0.00
0%
$0.00
12
HVAC rough-in
4.53%
$41,000.00
$0.00
0%
$0.00
100%
$41,000.00
Completed. Photos 1-14
13
Electrical rough-in
4.25%
$38,500.00
$0.00
0%
$0.00
100%
$38,500.00
Completed. Photos 2-17
14
Plumbing rough-in
5.75%
$52,000.00
$0.00
0%
$0.00
100%
$52,000.00
Completed. Photos 4-6
15
Finish electrical
1.05%
$9,500.00
$0.00
0%
$0.00
0%
$0.00
16
Finish plumbing
0.83%
$7,500.00
$0.00
0%
$0.00
0%
$0.00
17
Finish HVAC
0.72%
$6,500.00
$0.00
0%
$0.00
0%
$0.00
18
Exterior finish (stucco, siding)
2.93%
$26,500.00
$0.00
0%
$0.00
0%
$0.00
19
Exterior paint
1.22%
$11,000.00
$0.00
0%
$0.00
0%
$0.00
20
Drywall
4.86%
$44,000.00
$0.00
0%
$0.00
0%
$0.00
21
Interior doors & trim
1.77%
$16,000.00
$0.00
0%
$0.00
0%
$0.00
22
Railings
0.50%
$4,500.00
$0.00
0%
$0.00
0%
$0.00
23
Interior paint
1.93%
$17,500.00
$0.00
0%
$0.00
0%
$0.00
24
Flooring
2.71%
$24,500.00
$0.00
0%
$0.00
0%
$0.00
25
Cabinets
3.43%
$31,000.00
$0.00
0%
$0.00
0%
$0.00
26
Countertops
2.15%
$19,500.00
$0.00
0%
$0.00
0%
$0.00
27
Baseboards & trim
1.88%
$17,000.00
$0.00
0%
$0.00
0%
$0.00
28
Bathroom tile
2.43%
$22,000.00
$0.00
0%
$0.00
0%
$0.00
29
Appliances
2.60%
$23,500.00
$0.00
0%
$0.00
0%
$0.00
30
Driveway & parking
1.38%
$12,500.00
$0.00
0%
$0.00
0%
$0.00
31
Landscaping
1.55%
$14,000.00
$0.00
0%
$0.00
0%
$0.00
32
Flatwork
2.04%
$18,500.00
$0.00
0%
$0.00
0%
$0.00
33
Fencing
1.49%
$13,500.00
$0.00
0%
$0.00
0%
$0.00
34
Porches & decks
1.38%
$12,500.00
$0.00
0%
$0.00
0%
$0.00
35
Contingency
6.63%
$60,000.00
$0.00
0%
$0.00
0%
$0.00
Total direct costs & percentages
100.00%
$904,900.00
$0.00
20.10%
$181,900.00
52.20%
$472,400.00
Inspection Notes
* Required · Alerted Response · Comment
Were you able to confirm this project location's accuracy with a representative on-site?
No
Was GC on-site?
No
What is the temperature at the time of arrival?
90 - 100 F
What are the weather conditions at the time of arrival?
Partly Cloudy
How many workers present at time of the inspection?
0
Any known critical issues?
No
15
9/4/26 17:26 EDTRear exteriorTags: Windows, Roof
2
9/4/26 17:26 EDTFraming interior with HVACTags: Framing, HVAC
9/4/26 17:26 EDTWindows and RoofTags: Windows, Roof
Showing 6 of 20 photographs, numbered to the report.
15
Tags
Windows, Roof
Time
9/4/26 17:26 EDT
Location
GPS latitude and longitude, with a map on the report
Comment
Rear exterior
Rendered from RAZE demo projects. Line items and amounts are adjusted, and names, contact details and GPS coordinates are left out; delivered reports include them.
Draw sheet by budget line or draw stage
Percent complete and the dollars it supports on every line of your budget, with inspector comments where work remains.
Time and location stamped photographs
Numbered to the draw sheet and tagged by trade, with the capture time and GPS location on every photo.
Inspection notes
The same on-site questions on every visit, such as whether the GC was on site, how many workers were present, and any known critical issues.
Your template and your branding
Required photos and fields are configured per workflow, and the cover can carry your institution's logo, as on the bank report.
1.1
Days on average from request to submission (residential)
Draw inspections rarely fail in the field. They fail in the handoffs: email intake, scattered photos, and reports that vary by inspector and branch.
One Process for Every Branch
Inspections are requested the same way across branches and loans, with routing and approval steps defined by your institution.
Vendor Sprawl, Consolidated
Keep your internal inspectors and approved vendors through Direct Request, add Marketplace coverage where you need it, and hold every report to the same requirements.
Built to Support Audit and Exam Review
Photos, observations, and captured metadata stay linked to each inspection, supporting loan review, internal audit, and regulatory exams.
How Getting Started Works
From first call to first inspection.
RAZE adds a standardized inspection workflow around the systems you already use.
01
Request a Demo
In a 30-minute walkthrough we review how your team orders, tracks, and reviews draw inspections today, show the RAZE workflow on your loan types, and cover pricing and next steps.
02
Configure Your Workflow
Set required photos, observations, report format, and routing, using your inspectors and vendors through Direct Request, Marketplace coverage, or a mix.
03
Order Your First Inspections
Your team orders in the Ordering Engine, inspectors capture on site in the RAZE Mobile App, and standardized PDF reports are delivered in the Ordering Engine and by API.
FAQ
Questions lenders ask before getting started.
What happens on the demo?
It's a 30-minute call with the RAZE team. We review how you order, track, and review draw inspections today, show the RAZE workflow on your loan types, and cover pricing and next steps.
What does it cost to get started with RAZE?
$125 per single-family inspection through the Marketplace, plus $35 per additional unit. Direct Request is $25 per request. No minimums and no platform fee. Some programs include a one-time implementation fee, quoted before you sign.
How quickly does RAZE return a residential draw inspection?
RAZE averages 1.1 days from request to submission on residential draw inspections nationwide. Timing on any one inspection depends on site access, weather, and scheduling.
Do we need to change our loan systems to start?
No. RAZE layers around your CLA, LOS, and core and replaces none of them. RAZE also integrates with Presidium (by Codefi).
Can we start with our own inspectors?
Yes. With Direct Request, you send your own inspector or vendor through the same workflow and template. Where you need coverage, the Marketplace assigns a vetted inspector.
Can report requirements follow our draw policy?
Yes. Required photos, observations, and report expectations are configured per workflow, so every inspection follows your policy.
Are photos and inspection records retained for audits?
Yes. Images, notes, and inspection context stay attached to each inspection record.
Can every branch order inspections the same way?
Yes. Inspections are ordered through one Ordering Engine with institution-defined routing and approval steps, so every branch requests and receives inspections the same way.