It sets the baseline
Later reports show each line's prior percent beside the current one. The first inspection is where that record starts.

The first draw is the initial disbursement on a construction loan. It often covers permits, site work or a land payoff, and it is frequently subject to extra documentation requirements. It is also the draw with the least built work to look at.
This guide covers what a lender checks before the first money moves and what the first inspection is for. The draw schedule and how many draws a construction loan has have their own pages. Nothing here is legal advice. Lien priority and recording rules depend on state law, so confirm them with counsel.
Programs differ. On a Fannie Mae HomeStyle Renovation loan, the Selling Guide lets the lender fund up to 50 percent of the total planned renovation costs as an initial draw at closing, and part of that draw may pay for permits, architect fees and design or planning costs. Many lenders pay rehab draws after the work is done, and some advance part of the first draw. A lender's own policy should say which it does, by loan type.
The borrower's required cash or land contribution is typically injected before loan funds are advanced. Confirm it is in before the first draw.
Every later draw is measured against the approved budget. Settle the lines before the first request, not after it.
Construction lenders in Florida record the mortgage first and the notice of commencement second. Other states differ, so follow counsel.
Confirm builder's risk insurance is in place before the first draw.
Order the first inspection so the file shows the site as it stood when the loan began to fund.
Florida shows why the order matters. Section 713.13 of the Florida Statutes requires an owner to record a notice of commencement before beginning an improvement and to post a certified copy at the job site. Under Florida's priority rule, construction liens attach as of the recording of the notice of commencement, so a notice recorded before the lender's mortgage puts every contractor's lien ahead of the lender's lien. Construction lenders in Florida record the mortgage first and the notice second, and the first draw inspection often confirms the posted notice and the permit before any money moves. The notice of commencement page and the lien waivers guide cover the rest.
Recording order, notice rules and lien rights differ by state. Confirm them with counsel before the first draw on any loan.
Later reports show each line's prior percent beside the current one. The first inspection is where that record starts.
Most self-inspection programs keep an independent visit in reserve for the first draw, the final draw and any draw the photos do not support.
A new-construction lot can come due for its first draw before a map app knows the address.
Put the first-draw checks in the draw inspection policy: what the first draw may pay for, what must be in the file before it funds, who orders the first inspection and whether it must be independent. The draw inspection checklist covers what to look for at each stage after that, and the final draw guide covers the other end of the loan.
RAZE documents; the lender decides. The lender sets the required questions and photos on each order in the Ordering Engine, so a first-draw order can ask for the posted notice, the permit and the condition of the site. Every photo carries GPS coordinates and date and time stamps and links to the draw sheet line it supports. RAZE takes orders at any U.S. address, and the report is the same whether RAZE sends the inspector through Marketplace or the lender sends its own through Direct Request. RAZE does not approve, deny or fund draws.
The lender's policy decides. In Florida, the first draw inspection often confirms the posted notice and the permit before any money moves.
It often does, along with permits and site work. Whether a specific loan allows it depends on the program and the loan documents.
On most construction loans the lender orders the draw inspection, because the inspection protects the lender's advance.
Set the required photos on the first order and tie each one to its draw sheet line.
See a draw inspection on a project in your book, from order to delivered report.
Get Started→Set the required photos before the first draw.
Get Started