Construction Loan Equity: Cash, Land and Sweat Equity

A borrower owns the lot outright and plans to hang the drywall personally. How much of that is equity? The answer belongs in the draw policy before the first request arrives.
This guide covers cash, land and sweat equity and what a policy writes down about each. It gives no percentage: each lender sets its own equity requirement.
Cash, land and sweat equity
| The form | What it is | How it counts |
|---|---|---|
| Cash | What it isPart of the borrower's required cash or land contribution | How it countsThe contribution is typically injected before loan funds are advanced |
| Land equity | What it isThe value of borrower-owned land | How it countsCounted toward the equity requirement |
| Sweat equity | What it isValue contributed through the borrower's own labor | How it countsMost lenders limit or exclude it |
The equity requirement is the borrower's required cash or land contribution to the project. Lenders use loan-to-cost, the ratio of the loan amount to the total project cost, to size loans and set required borrower equity.
What the policy writes down
- 1
State the requirement
The lender sets its own equity requirement. A policy that states it once gives every loan the same starting point.
- 2
Say when the equity goes in
Equity is typically injected before loan funds are advanced. The first draw guide covers what a lender verifies before the first disbursement.
- 3
Say how land counts
Land equity is the value of borrower-owned land counted toward the requirement. A lot loan, financing for land intended for future construction, is often refinanced into the construction loan.
- 4
Say whether sweat equity counts
Most lenders limit or exclude sweat equity because it is hard to verify. The owner-builder guide covers the draw controls on a loan where the borrower is the general contractor.
The lender sets the requirement.
This guide names no percentage and recommends no treatment of land or labor. Each lender sets its own equity requirement, and the loan documents govern.
Where RAZE fits
RAZE documents the work; the lender decides what to fund. A draw inspection documents work in place, whoever did the work. It does not value a borrower's labor, and it does not confirm a cash contribution.
The lender sets the required questions and photos on each order in the Ordering Engine. The report comes back by line item, with each photo carrying GPS coordinates and date and time stamps and linked to the draw sheet line it supports. RAZE does not approve, deny or fund draws.
Frequently asked questions
It is the value of borrower-owned land counted toward the equity requirement in a construction loan.
It is financing for the purchase of land intended for future construction, often refinanced into the construction loan.
The borrower's required cash or land contribution is typically injected before loan funds are advanced. Each lender sets its own requirement.
Keep reading
Can sweat equity count toward a construction loan?
The short answer on borrower labor.
First draw on a construction loan
What to verify before the first disbursement.
Owner-builder construction loans
Draw controls when the borrower is the builder.
How to write a draw inspection policy
The policy these lines belong in.
The work in place, line by line
See progress by line item, with photos tied to each line.
For Lenders
See a draw inspection on a project in your book, from order to delivered report.
Get Started→The policy says what counts as equity.The report shows the work in place.
Read every draw against the work in place.
Get Started