Back to Blog
LendersDraw InspectionsConstruction Loans

Insurance in the Construction Draw File

ByRAZE Team
•November 20, 2026•5 min read
Insurance in the Construction Draw File

A fire takes a framed house the week after a draw funds. The inspection report shows what stood on the site. Whether that value comes back depends on a different page in the file: the insurance.

This guide lists the insurance documents a lender may ask to see and when. It recommends no coverage and no limit, and it is not insurance advice. Each lender sets its own requirements.

Six terms in the insurance file

Certificate of insurance (COI)What it isThe document evidencing a party's coverage, limits and effective datesThe detail that mattersCollected and tracked by lenders
Builder's risk insuranceWhat it isProperty coverage protecting a structure under constructionThe detail that mattersAgainst fire, wind, theft and vandalism until completion
Loss payeeWhat it isThe party designated to receive insurance proceedsThe detail that mattersTypically the lender for property coverage
Mortgagee clauseWhat it isThe policy provision protecting the lender's interestThe detail that mattersRequires notice before cancellation
Course of construction endorsementWhat it isPolicy language adapting homeowner or property coverageThe detail that mattersApplies to a structure while it is being built
Vacancy clauseWhat it isA provision reducing or voiding coverage if the property is vacant beyond a stated periodThe detail that mattersA risk on stalled projects

The contractor carries policies too. General liability insurance is coverage for third-party bodily injury and property damage arising from the contractor's operations. Workers' compensation is statutorily required coverage for employee injuries on the job; lenders verify contractors carry it.

When a lender looks at it

  1. Before the first draw

    Lenders require builder's risk insurance, named as mortgagee, before the first draw. The first draw guide covers the rest of that file.

  2. Before each draw

    Lenders confirm the certificate of insurance, the coverage amount against the completed value, the mortgagee clause and the policy term before each draw. The builder's risk insurance page covers what the policy leaves out.

  3. When the schedule slips

    Lenders extend the policy when the schedule slips past its expiration. The construction loan extensions guide covers the dates on the loan side.

  4. When a project stalls

    A vacancy clause can reduce or void coverage if the property is vacant beyond a stated period. The stalled loan guide covers what the inspection record shows.

This is not insurance advice.

This guide lists documents a lender may ask to see. It recommends no coverage, limit or carrier. The lender's policy, the loan documents and the insurance agent decide what a loan needs.

Where RAZE fits

RAZE documents the work; the lender decides what to fund. The inspection documents what exists on the site. A report that photographed the roof, windows and wrap is also a record of what stood on the site on that date.

A draw inspection is not an insurance review, and RAZE does not review policies. Each photo carries GPS coordinates and date and time stamps and is linked to the draw sheet line it supports. RAZE does not approve, deny or fund draws.

Frequently asked questions

It is the document evidencing a party's coverage, limits and effective dates. Lenders collect and track it.

It is the party designated to receive insurance proceeds, typically the lender for property coverage.

It is a policy provision reducing or voiding coverage if the property is vacant beyond a stated period. It is a risk on stalled projects.

Keep reading

A dated record of what stood on the site

See progress by line item, with photos tied to each line.

For Lenders

See a draw inspection on a project in your book, from order to delivered report.

Get Started

The Short Questions

How reports handle photos, percent complete and draw sheet lines.

Read the FAQs

The policy insures the work.The report shows what the work was.