Completing the Questionnaire

Answer the site questions about your visit, from who was on-site to the weather, then sync to finish the last section.

Download on the App Store
Get it on Google Play

Quick Reference

From Your Inspection, open Questionnaire.

Expand Inspection Notes to see the questions.

Answer each question: tap Yes or No, pick from a list, or choose a date.

Tap Sync data, then confirm Questionnaire shows a check.

Before You Start

You're at the property, or have just finished your visit, so your answers reflect conditions on arrival.

You've opened the assigned inspection in the RAZE mobile app.

Step 1 — Open the Questionnaire

Start from Your Inspection

Tap Questionnaire on Your Inspection.

Screenshot: Start from Your Inspection
Tap Questionnaire.

Step 2 — Open the Questions

Expand Inspection Notes

The Questionnaire Summary shows Total Questions, Total Required, and Total Answered. Tap Expand next to Overview, then tap Inspection Notes to open the questions.

Screenshot: Expand Inspection Notes
Tap Expand, then Inspection Notes.

Step 3 — Answer Each Question

Yes or No questions

Tap the circle next to Yes or No. A filled green circle marks your answer.

Screenshot: Yes or No questions
Yes is selected for the first question and No for "Was GC On-Site?"

Questions with a list

For temperature, weather, and number of workers, tap Select and choose an option from the list.

Screenshot: Questions with a list
Weather options: Clear or Sunny, Partly Cloudy, Rainy, or Snowy or Icy.

Date questions

For "What time did you arrive On-site?", tap the field and pick the date from the calendar. "Any known Critical Issues?" has Yes and No buttons and a comment box (up to 150 characters) to describe what you found.

Screenshot: Date questions
The arrival date is filled in.

Answers save on your phone as you go. The status under the property header shows "Saved locally" until you sync.

Step 4 — Sync and Finish

Confirm the Questionnaire is complete

Tap Sync data, then go back to Your Inspection. Questionnaire shows a check. When Photo Gallery, Draw Sheet, and Questionnaire are all checked, the button at the bottom changes to Submit Inspection Report.

Screenshot: Confirm the Questionnaire is complete
All three sections are checked and Submit Inspection Report is ready.

Tips

DO

  • •Answer for conditions when you arrived on-site.
  • •Use the comment box under "Any known Critical Issues?" to describe anything the lender should know.
  • •Sync data before you leave the Questionnaire.

WATCH FOR

  • •Collapsed sections. Questions stay hidden until you expand Inspection Notes.
  • •"Saved locally" means your answers are on your phone only. Sync to send them.
  • •Different questions. Your inspection's questionnaire may differ from this example.

Troubleshooting

Tap Expand next to Overview, then tap Inspection Notes.

Open the Questionnaire, tap Sync data, and wait for the sync to finish.

The button appears only when Photo Gallery, Draw Sheet, and Questionnaire are all checked. Open any section without a check, finish it, and sync.

Use this guide with AI.

Ask RAZE AI here, or hand the plain-text guide to the assistant you already use.

Was this guide helpful?

Still stuck? Ask RAZE.

Ask RAZE AI for an instant answer from these guides, or send a request and the RAZE support team replies by email.

  1. Ask RAZE AI.

    Instant answers from these guides, any time.

  2. Send a support request.

    Tell us the product and guide; the form is here.

Goes straight to the RAZE support inbox.