Completing the Draw Sheet

Record your recommendation for each line item, add notes where they help, and sync your work to the inspection.

Download on the App Store
Get it on Google Play

Quick Reference

From Your Inspection, open Draw Sheet.

Tap the checkmark on a line item to recommend its full Available %.

Add detail to the line item's note when it helps.

Tap Sync data, then confirm Draw Sheet shows a check.

Before You Start

You've filled the Coordination Note and started the inspection.

You've checked the work on-site for each line item.

Your photos are captured and commented. Using RAZE AI for Photo Comments shows how to draft photo comments with one tap.

Step 1 — Open the Draw Sheet

Start from Your Inspection

Your Inspection lists three sections: Photo Gallery, Draw Sheet, and Questionnaire. A check appears next to each one when it's complete. Tap Draw Sheet.

Screenshot: Start from Your Inspection
Tap Draw Sheet on Your Inspection.

Step 2 — Recommend Each Line Item

Read the line item

Each line item shows Budgeted, Previous, and Available percentages, with Your Recommendation on the right. When the work for a line item is complete, tap the checkmark next to Your Recommendation.

Screenshot: Read the line item
Tap the checkmark to recommend the line item.

The recommendation fills in

RAZE fills Your Recommendation with the full Available % and adds a "Completed." note under the line item. New Progress and Total Completion at the bottom update, and the status under the property header shows "Saving..." and then "Saved."

Screenshot: The recommendation fills in
Permits now shows 1.0% recommended, a "Completed." note, and updated progress.

A line item you don't check stays at 0%, like Well in this example.

Step 3 — Add Detail to the Note

Edit the note

Tap the note under a line item to edit it. Type your detail after "Completed." and tap the green send arrow to save it. To speak your note instead of typing, see Using Talk-to-Text for Draw Sheet Notes.

Screenshot: Edit the note
Add your detail, then tap the send arrow.

Step 4 — Sync Your Work

Tap Sync data

When you've finished the line items, tap Sync data at the bottom of the Draw Sheet.

Screenshot: Tap Sync data
Notes save to each line item. Tap Sync data when you're done.

Confirm the Draw Sheet is complete

Back on Your Inspection, Draw Sheet shows a check once the sync finishes.

Screenshot: Confirm the Draw Sheet is complete
Draw Sheet is checked on Your Inspection.

Tips

DO

  • •Check a line item only after you've verified the work on-site.
  • •Add a short note when it helps explain the work, like "cleared land, no footings yet."
  • •Sync data when you finish the Draw Sheet.

WATCH FOR

  • •The checkmark recommends the full Available %. Use it only when that line item's work is complete.
  • •Every checked line item gets a "Completed." note. Edit it if that doesn't describe what you saw.
  • •A status of "Saving..." means your change is still being saved. Wait for "Saved."

Troubleshooting

Open the Draw Sheet, tap Sync data, and wait for the sync to finish.

Check your phone's connection and give it a moment. If it doesn't change to "Saved," contact RAZE support at contact@getaraze.com.

The Draw Sheet opens on the Available tab. Tap All at the top to see every line item.

Use this guide with AI.

Ask RAZE AI here, or hand the plain-text guide to the assistant you already use.

Was this guide helpful?

Still stuck? Ask RAZE.

Ask RAZE AI for an instant answer from these guides, or send a request and the RAZE support team replies by email.

  1. Ask RAZE AI.

    Instant answers from these guides, any time.

  2. Send a support request.

    Tell us the product and guide; the form is here.

Goes straight to the RAZE support inbox.