Foundation Draw Inspection: Before the Pour

By the time the slab is finished, much of the work this draw paid for is under it: the footings, the steel, the membrane and the soil treatment. A report taken after the pour shows the slab. It cannot show what is inside it.
This guide lists the foundation terms a draw desk meets and what a draw record can show before and after the pour. A draw inspection is not a structural or code inspection. The building department and the engineer decide compliance.
Eight terms at the foundation
| The term | What it is | Visible after the pour? |
|---|---|---|
| Footings | What it isBelow-grade concrete bases that spread the structure's load to the soil and anchor the foundation | Visible after the pour?No; below grade |
| Slab-on-grade | What it isA reinforced concrete floor poured directly on prepared ground, serving as both foundation and floor | Visible after the pour?Yes; it is the visible surface |
| Monolithic slab | What it isA slab and thickened-edge footings poured in a single placement | Visible after the pour?The edges only |
| Stem wall | What it isA short foundation wall rising from the footing to support the floor structure above grade | Visible after the pour?Yes; above grade |
| Rebar | What it isSteel reinforcing bars embedded in concrete to provide tensile strength | Visible after the pour?No; embedded |
| Vapor barrier | What it isA plastic membrane under the slab blocking ground moisture from migrating into the building | Visible after the pour?No; under the slab |
| Termite treatment (pre-treat) | What it isSoil treatment applied before the slab pour to prevent subterranean termite intrusion | Visible after the pour?No; applied to the soil |
| Form board survey | What it isA survey verifying foundation forms are correctly placed within setbacks before concrete is poured | Visible after the pour?It is a document, not a photo |
Four of the eight are hidden once the slab is poured, and a monolithic slab's footings show only at the edges. The glossary notes that termite pre-treat is required in many southern jurisdictions and that slab-on-grade is standard in Florida, so this draw carries more hidden work in some markets than in others.
Two visits, two records
- 1
Before the pour
Forms are set, the steel is in, the membrane is down and the ground is treated. A visit now photographs work that will not be visible again. Whether to order one is the lender's policy call.
- 2
The survey in the file
The form board survey verifies the forms sit within setbacks before concrete is poured. It comes from a surveyor; the draw file holds it beside the inspection when the policy requires it.
- 3
After the pour
The ordinary foundation draw visit happens after the slab is poured and before framing starts. The draw inspection checklist covers what that visit shows and when to hold the draw.
- 4
Before the next draw
Framing covers the slab edges and plumbing stub-ups. Anything the policy wants on record from the foundation stage belongs in the file before the framing draw funds.
This is not a structural or code inspection.
A draw inspection documents visible work in place. It does not test concrete, check rebar spacing or certify code compliance. The building department and the engineer decide compliance.
Where the code inspection fits
Under Section R109 of the International Code Council's 2021 International Residential Code, the inspections a building official makes on a permitted home include the foundation, and work that fails is corrected before it is covered. Cities and counties adopt the code with their own amendments, so the list varies by place and edition. That inspection belongs to the city or county, and its result is a separate record. The permits and code inspections guide covers how the two sit side by side, and the short answer on a draw inspection versus a building code inspection covers who checks what.
Where RAZE fits
RAZE documents the work; the lender decides what to fund. A RAZE report shows percent complete by draw sheet line, and the lender's policy decides which visits to order.
Each photo carries GPS coordinates and date and time stamps and is linked to the draw sheet line it supports, so a pre-pour photo shows when the steel and membrane were in place. RAZE does not approve, deny or fund draws.
Frequently asked questions
It is a slab and thickened-edge footings poured in a single placement.
It is a survey verifying foundation forms are correctly placed within setbacks before concrete is poured.
It is a plastic membrane under the slab blocking ground moisture from migrating into the building.
Keep reading
A dated record before the concrete
See progress by line item, with photos tied to each line.
For Lenders
See a draw inspection on a project in your book, from order to delivered report.
Get Started→The slab covers the work.The record keeps it.
Read every draw against the work in place.
Get Started