Are soft costs paid through construction draws?

Reviewed by
Reviewed by RAZE
Last reviewed

Short answer

They can be, when the loan budget includes them. Soft costs are non-construction project costs such as architecture, engineering, permits, legal fees, insurance and financing charges. A lender supports them with invoices, because a draw inspection documents work in place and cannot verify a soft cost. The loan agreement sets which ones are funded.

Hard costs and soft costs.

A construction budget holds two kinds of cost. Hard costs are the direct construction costs that physically build the project: labor, materials, equipment and site work. Soft costs are the non-construction project costs, such as architecture, engineering, permits, legal fees, insurance and financing charges.

Both can appear on a draw request. Whether a given soft cost is funded through draws, paid at closing or paid by the borrower depends on the loan program and the loan agreement.

What supports a soft cost.

A draw inspection documents work in place. An inspector can photograph framing and report its percent complete. An engineer's invoice or a permit fee leaves nothing on site to inspect.

Soft costs are supported on paper instead:

  • Invoices and receipts. The lender's policy names what the file needs for each soft line.
  • The lender's own records. Interest paid from an interest reserve and the lender's draw fee are supported by the lender's own records and fee schedule.

Why it matters for lenders.

A clean inspection says nothing about the soft lines on the same draw. If the desk treats the report as support for the whole request, a soft cost can be paid with no review at all. Cost-to-complete starts from the approved budget, so soft lines that are in the budget and not yet paid are part of it when the loan is checked for balance. The soft cost draws guide covers the rule to write.

How RAZE handles it.

RAZE covers the lines an inspector can see. A RAZE report shows percent complete by draw sheet line, with photos that carry GPS coordinates and date and time stamps. RAZE does not verify invoices or soft costs, and it does not approve, deny or fund draws.

Sources

Primary sources only. Where a figure appears on this page, it comes from one of these.

  1. 1.Construction Lending GlossaryRAZE
  2. 2.Soft Cost Draws: What an Inspection Cannot VerifyRAZE
  3. 3.Construction Loan Draw FeesRAZE

See the workflow behind the answer.

RAZE standardizes how draw inspections are ordered, dispatched, captured and delivered, inside the loan administration workflow a lender already runs.

Get Started