Reviewing a Commercial Draw
The quick view opens one inspection in a single panel, from its dates to its photos and commercial details.
Runs on: Desktop and tablet. A web app you open in a browser; it is not built for phones.
Commercial inspections
Quick Reference
Open the project and click the Jobs tab.
Open the inspection's quick view.
Read About, Assigned to, Photos, Property and Commercial.
Click View Report for the PDF.
Accept or reject the submitted inspection.
Before You Start
The inspector has submitted the report.
You have the pay application or draw request to compare against.
Step 1 — Find the Inspection
The Jobs tab
The Jobs tab shows every inspection on the project with its progress: the photo count, the status, the last status update, and the previous, current and remaining complete with their amounts.
Step 2 — Open the Quick View
One panel for the whole inspection
The quick view opens one inspection in a single panel: About with the Requested, Submitted and Due dates, Assigned to, Photos with a count, Property, the Commercial details, Borrower & GC, the Questionnaire and the Draw Sheet.
Photos, full size
Open any photo full size with the inspector's comment under it.
View Report
Click View Report to open the PDF the inspector submitted.
Step 3 — Decide
Accept or reject
The reviewer accepts or rejects a submitted inspection, and an accepted one shows Lender Approved. RAZE asks you to confirm, then shows Inspection accepted.
Only submitted inspections can be accepted or rejected.
If your institution uses auto-approve
Auto-approve is a workflow setting your institution turns on, not an AI decision. With it on, a submitted inspection is approved by that setting. Funding stays your decision either way.
Tips
DO
- •Compare the Draw Sheet with the pay application before you decide.
- •Open the photos tagged to the lines with the largest amounts.
- •Read the inspector's comments on lines where the figure differs from the request.
WATCH FOR
- •Lender Approved is the final status of an approved inspection.
- •A rejection goes back to the inspector, so say what needs to change.
Troubleshooting
Commercial draw workflow
- Review a commercial inspection (this guide)
Use this guide with AI.
Ask RAZE AI here, or hand the plain-text guide to the assistant you already use.
Was this guide helpful?
Still stuck? Ask RAZE.
Ask RAZE AI for an instant answer from these guides, or send a request and the RAZE support team replies by email.
Ask RAZE AI.
Instant answers from these guides, any time.
Send a support request.
Tell us the product and guide; the form is here.
Call or email.