Does a failed code inspection stop a construction draw?

Reviewed by
Reviewed by RAZE
Last reviewed

Short answer

Not by itself. A failed code inspection is the building department's rejection, requiring corrections and re-inspection before work continues. Whether a pending draw is funded is the lender's decision under its policy and loan documents. A draw inspection is a separate record that documents the work in place.

What a failed code inspection is.

Building inspections are the municipal inspections at code-required stages, such as footing, framing, rough MEP and final, that authorize work to proceed. The permit holder calls for each one. A failed inspection, or correction notice, is an inspector's rejection requiring corrections and re-inspection before work continues.

It is a record between the permit holder and the building department. It says the work did not meet the code on the day the official looked. It does not say how much of a budget line is complete.

What it means for the draw.

A draw inspection answers a different question from a code inspection: whether the work claimed in a draw request is in place. The two are compared in draw inspection vs. building code inspection.

Three records decide what a failed code inspection means for a pending draw:

  • The loan documents. The loan agreement sets the conditions for a draw.
  • The draw policy. It says whether the lender wants to see the notice, who reviews it and what happens to the request.
  • The draw report. It shows what work is in place, whatever the building department found.

A stop work order is a different event. It is an official order halting construction due to violations, permit issues or safety hazards.

Why it matters for lenders.

A lender that relies on the building department's record alone has no evidence of its own about progress. A lender that ignores that record can miss a correction that has to be made before work continues. Keeping both in the file lets a reviewer read them together. The permits and code inspections guide covers what to write into policy.

How RAZE handles it.

RAZE runs the lender's side. The lender sets the required questions and photos on each order in the Ordering Engine, and every report carries GPS and time-stamped photos linked to the draw sheet line items they support. RAZE does not perform code inspections or issue permits; the lender decides what funds.

Sources

Primary sources only. Where a figure appears on this page, it comes from one of these.

  1. 1.Construction Lending GlossaryRAZE
  2. 2.What is the difference between a draw inspection and a building code inspection?RAZE
  3. 3.Permits, Code Inspections and Construction DrawsRAZE

See the workflow behind the answer.

RAZE standardizes how draw inspections are ordered, dispatched, captured and delivered, inside the loan administration workflow a lender already runs.

Get Started