Back to Education Hub
Draw InspectionsConstruction LoansEducation

Construction Draw Inspection Glossary: 500+ Terms, Interactive House Map & Field Guide

ByRAZE
July 28, 202615 min read
Construction Draw Inspection Glossary: 500+ Terms, Interactive House Map & Field Guide

Built for draw inspectors and construction lending teams — whether you're learning what a draw inspection is or verifying your hundredth dry-in. Start on the house below, walk the 7-stage field guide, then search the full glossary.

At a glance

506

Terms defined

11

Categories

11

Tappable house points

Explore the House — Tap Any Point

Eleven components in build order — the same sequence a draw schedule follows, foundation to roof. Tap a point, read the definition, jump to the full glossary.

grade1234567891011
Step 1 of 11
Footings
Site Work & Foundation

Below-grade concrete bases that spread the structure's load to the soil and anchor the foundation.

Start with the 12 core terms

The vocabulary every draw decision runs on. Tap any term to see its definition in the glossary.

Draw Inspection Field Guide: What to Verify at Each Stage

New to draw inspections? These are the seven broad stages of a residential build, illustrated, with the checkpoints an inspector confirms at each visit. Tap any term chip for its full definition.

Important: Draw schedules vary. Some lenders fund four draws, others eight or more; line-item schedules don't map one-to-one to stages, and stages can overlap or be combined. The stage numbers below describe the sequence of construction — the loan agreement's draw schedule always controls what each draw funds.

Stage 1

Site Work & Pad

What to verify on site:
  • Pad cleared, filled, and at grade
  • Silt fence / erosion control in place
  • Permit posted and NOC recorded
Stage 2

Foundation & Slab

What to verify on site:
  • Slab poured and footprint matches plans
  • Stub-ups (plumbing sleeves) visible
  • Form board survey / termite treatment done
Stage 3

Framing / Lintel

What to verify on site:
  • Walls plumb, trusses set and braced
  • Hurricane straps / tie beam complete
  • Window and door openings match plans
Stage 4

Dry-In

What to verify on site:
  • Roof covering or sealed underlayment on
  • Windows and exterior doors installed
  • House wrap / WRB complete — weathertight
Stage 5

Rough-Ins (MEP)

What to verify on site:
  • Electric, plumbing top-out, HVAC roughed
  • Municipal rough inspections passed (green tags)
  • Nothing covered before it's verified
Stage 6

Interior Finishes

What to verify on site:
  • Drywall finished, paint underway
  • Cabinets, tops, and flooring installed
  • Trim, doors, and fixtures set
Stage 7

Final / CO

What to verify on site:
  • Certificate of occupancy issued
  • Punch list complete, site cleaned
  • Final lien waivers collected

The Full Construction Lending Glossary — 506 Terms A–Z

506 termsSorted A–Z
100/300 Guidance
Loan Admin & Compliance

Interagency supervisory thresholds flagging banks whose construction loans exceed 100% of total risk-based capital, or whose total CRE exceeds 300% with rapid growth — triggering enhanced risk-management expectations.

3-Tab Shingles
Roofing & Exterior

Single-layer asphalt shingles cut into three tabs — the economy roofing option.

Absorption Rate
Valuation & Appraisal

The pace at which available homes or lots sell in a market, used to gauge demand for spec construction.

Acquisition and Development (A&D) Loan
Lending & Draws

Financing for land purchase plus horizontal improvements — grading, roads, and utilities — to create buildable lots.

Actual Cash Value (ACV)
Insurance & Risk

Insurance settlement basis equal to replacement cost minus depreciation.

Additional Insured
Insurance & Risk

A party (such as the lender or owner) added to another's liability policy for protection against project claims.

Adjustment
Valuation & Appraisal

A dollar or percentage change applied to a comp's sale price to account for differences from the subject property.

AFCI
MEP Systems

Arc-fault circuit interrupter protection detecting dangerous arcing, required on most living-area circuits.

After-Repair Value (ARV)
Lending & Draws

The projected market value of a property after renovations are complete, used heavily in fix-and-flip lending.

Air Sealing
Interior Finishes

Closing gaps and penetrations in the building envelope to reduce uncontrolled air leakage.

Allowance
Project Management

A budget placeholder for unselected items (e.g., flooring); actual selections reconcile against it.

Allowance for Credit Losses (ACL)
Loan Admin & Compliance

The reserve banks hold against expected loan losses under the CECL accounting standard.

Ampacity / Panel Size
MEP Systems

The panel's rated capacity (commonly 200A residential), sized to the home's electrical load.

Anchor Bolts
Site Work & Foundation

Bolts embedded in the foundation that secure the sill plate and frame against uplift and lateral loads.

Appliance Package
Interior Finishes

The kitchen and laundry appliances specified in the budget and installed near completion.

Appraisal
Valuation & Appraisal

An independent, licensed opinion of a property's value, required for most real-estate-secured loans.

Appraisal Gap
Valuation & Appraisal

The shortfall when appraised value comes in below purchase price or projected cost, requiring extra borrower equity.

Appraisal Independence
Loan Admin & Compliance

Rules insulating appraisers from pressure by loan production staff, enforced through ordering firewalls and appraisal management companies.

Appraisal Management Company (AMC)
Valuation & Appraisal

A third party that orders, assigns, and reviews appraisals, providing independence between lenders and appraisers.

Appraisal Review
Valuation & Appraisal

A qualified reviewer's assessment of an appraisal's accuracy and compliance before the lender relies on it.

Appraised Value vs. Purchase Price
Valuation & Appraisal

Lenders generally underwrite to the lower of the two, which affects maximum loan amount.

Architectural Shingles
Roofing & Exterior

Laminated, dimensional asphalt shingles with longer warranties and higher wind ratings than 3-tab.

As-Built Drawings
Project Management

Revised drawings documenting what was actually constructed, including field changes.

As-Completed Value
Lending & Draws

The appraised value a property is expected to have once construction is finished, used to underwrite construction loans.

As-Is Value
Lending & Draws

The current market value of a property in its present condition, before any construction or improvement.

Assessed Value
Valuation & Appraisal

The value a taxing authority assigns for property tax purposes, often differing from market value.

Assignment of Contracts
Legal, Title & Liens

The lender's right to step into the borrower's construction contract and plans if the loan defaults.

Audit Trail
Loan Admin & Compliance

The complete, timestamped record of every action, document, and decision on a loan file, allowing any disbursement to be reconstructed and defended.

Automated Valuation Model (AVM)
Valuation & Appraisal

A statistical model estimating property value from data, used for screening and portfolio monitoring rather than origination of construction loans.

Backflow Preventer
MEP Systems

A device stopping contaminated water from flowing backward into the potable supply.

Backsplash
Interior Finishes

The protective, decorative wall surface behind counters, typically tile.

Balloon Framing
Framing & Structure

An older method with studs running continuously from foundation to roof, largely replaced by platform framing.

Balusters
Interior Finishes

The vertical posts supporting a handrail, spaced to prevent fall-through.

Baseboard
Interior Finishes

Trim covering the joint between wall and floor.

Basement Foundation
Site Work & Foundation

A full-height below-grade foundation creating usable space beneath the first floor.

Bath Exhaust Fan
MEP Systems

The vented fan removing moisture from bathrooms to prevent mold, required to duct outdoors.

Batt Insulation
Interior Finishes

Pre-cut fiberglass or mineral wool blankets fitted between framing members.

Beam
Framing & Structure

A major horizontal structural member carrying loads from joists or walls to posts or foundations.

Bearing Capacity
Site Work & Foundation

The maximum load soil can support without failure or excessive settlement.

Below-Grade Plumbing
Site Work & Foundation

Sewer, drain, and supply piping installed beneath the slab or ground level before the foundation pour.

Anatomy of a Draw Cycle

  1. Draw request

    Borrower / builder submits the draw request to start the cycle.

  2. Inspection ordered

    The ordering engine routes the inspection request.

  3. Site inspection

    Field visit with geo-stamped photos — the control point between the request and the money.

  4. Report review

    Percent complete is verified against the budget and plans.

  5. Approval

    Loan balancing and approval before funds move.

  6. Funds released

    Disbursement closes the cycle and feeds the audit trail.

Build Phases and Inspection Checkpoints

Site work

Clear and grade — inspection covers permits and pad.

Foundation

Footings and slab — inspection confirms slab poured.

Framing

Walls and trusses — inspection confirms frame complete.

Dry-in

Roof and windows — inspection confirms weathertight.

MEP rough

Electric, plumbing, HVAC — inspection confirms rough-ins passed.

Finishes

Drywall and trim — inspection confirms interior finished.

Final / CO

Punch list and occupancy — final draw gated by CO and lien waivers.

How the job site maps to the loan file

One common pattern: an inspection verifying each phase before the draw that funds it. The number of draws and which phases they cover vary by lender, program, and loan agreement.

Draw Inspection FAQs

Keep Learning — Draw Inspection Resources

Put the vocabulary to work

RAZE turns draw inspections into fast, photo-documented, audit-ready reports — so every term in this glossary shows up correctly in your loan file.

Request a Free Demo