# Naming Inspections and Using the Final Template

> Name every inspection with the same variables so jobs are easy to find, and require 25 photos on the final draw.

Product: RAZE Ordering Engine
Runs on: Desktop and tablet. The RAZE Ordering Engine is a web app for desktop and tablet browsers, not a phone app.
Product guides: https://getaraze.com/tools/ordering-engine
Source: https://getaraze.com/tools/ordering-engine-inspection-naming-and-final-template
All guides: https://getaraze.com/tools

## Quick Reference

- Click the sliders icon in the Inspection Name field.
- Tick Stage #, Inspection start date, or Project name.
- Check the sample preview. Names are limited to 50 characters.
- For the last draw, set Utilize "Final" Template to Yes.

## Before You Start

- You have a Quick, Custom, or Workflow order form open.

## Step 1: Configure the Name

**Pick the variables.** Click the sliders icon in the name field to open Configure Variables. Tick Stage # (ST), Inspection start date (ISD), or Project name (PN). Add a short complement if you need one, then check the sample preview.

![The sliders icon, Configure Variables, and the sample preview.](https://getaraze.com/images/docs/ordering-engine/ordering-engine-inspection-naming-and-final-template/01-naming-variables.webp)

## Step 2: Turn On the Final Template

**Flip the toggle to Yes.** Set Utilize "Final" Template to Yes on the final draw. The inspector cannot submit until 25 photos are attached.

![The Utilize "Final" Template toggle.](https://getaraze.com/images/docs/ordering-engine/ordering-engine-inspection-naming-and-final-template/02-final-template.webp)

## Tips

**DO**
- Use the same variables on every order.
- Turn on Final only for the final draw.

**WATCH FOR**
- Names are limited to 50 characters, variables included.
- With Final on, the inspector cannot submit with fewer than 25 photos.

## Troubleshooting

**Q: The name is cut off.**
A: Names are limited to 50 characters. Shorten the complement.

**Q: The inspector can't submit.**
A: If the Final template is on, the job needs at least 25 photos.

**Q: Which variables can I use?**
A: Stage # (ST), Inspection start date (ISD), and Project name (PN).

## Need Help?

Email RAZE support at contact@getaraze.com, or send a support request from https://getaraze.com/tools.
